- BuildPadAI rapid application development for secure, tailored internal tools.
- Chocolate FactoryAgentic AI platform to observe, teach and configure your agents.
- Cloud PrimusOne control plane for AI and cloud, with cost control built in.
- SentryPageIntelligent website defacement monitoring that catches changes fast.
- VisorOne AI-powered CMS for every enterprise website you run.
Plants: machine readings sent to specialists

Condition checks still run on a calendar and a clipboard, and the report lands days after the reading was taken
The problem
Machine condition is still checked by sending a person. Someone travels to site, walks the plant, fills in a form, and writes it up days later. By the time the report lands the machine has moved on, and the reading it describes belongs to a shift that has already ended. Meanwhile the schedule that triggered the visit is a calendar, not a machine. Healthy equipment gets inspected because the month rolled over, and equipment that started drifting the week after an inspection waits until the next one.
The usual answer
The readings the specialist came for mostly already exist. Temperature, pressure, vibration, cycle counts and current draw are being produced continuously by the machine or by sensors bolted to it. What is usually missing is a path off the plant floor.
How we approach it
We build that path. Readings go to a data platform, sit in one place across machines and across sites, and trend over time. Machines that predate any network get instrumented separately rather than replaced, so a mixed-age plant can be covered in one view. The specialist sees the readings without travelling, and sees a change while it is still a change rather than a breakdown.
What changes
Attention lands where the machines need it. Visits stop being routine and start being deliberate, and the specialist spends the day on the machine that is asking for help.
